Project Name: Danieldale Road

Project Location/Limits: West city limits to Westmoreland Road intersection and 500 ft. on N. Westmoreland Rd. near the intersection.

Project Type: Street Widening

Project Description: Widen roadway to 4 concrete lanes (2 lanes per direction separated by raised median). Includes drainage improvements, permanent traffic signal at Bolton Boone intersection, trail/sidewalk, landscape and street lighting

Project Status: Design is 90% complete. Value engineering was conducted to reduce project cost. Conceptual design for aesthetics improvement / artwork installation is complete.

Last Update: July 2024

City Contact: MD Hossain

 

Project Name: Pleasant Run Road

Project Location/Limits: Cockrell Hill Road to Westmoreland Road

Project Type: Street Widening

Project Description: Widen roadway to 4 concrete lanes (2 lanes per direction separated by raised median). Includes drainage improvements, water line replacement, sewer line replacement, sidewalks, landscaping and street lighting

Project Status: Design 100% Complete - Franchise Utility relocations are in progress and about 30% complete. City is currently working on necessary demolition work.

Last Update: July 2024

City Contact: MD Hossain

 

Project Name: Westmoreland Road

Project Location/Limits: Belt Line Road to Parkerville Road

Project Type: Street Widening

Project Description: Widen roadway to 4 concrete lanes (2 lanes per direction separated by raised median). Includes drainage improvements, water line replacement, traffic signal at Eagle and Parkerville intersections, sidewalks, trailhead, landscaping and street lighting

Project Status: City staff received 100% design and bid documents for review. Project is awaiting for necessary funding availability and allocation.

Last Update: July 2024

City Contact: MD Hossain

 

Project Name: Hampton Road Corridor Redevelopment

Project Location/Limits: Pleasant Run Road to Belt Line Road

Project Type: Corridor Redevelopment

Project Description: On Hampton Rd., between Belt Line and Pleasant Run, is broken into a 3-lane segment roadway from Pleasant Run Road to Heath Creek with buffered bike lanes, on-street parking, and a pedestrian plaza and a 2-lane segment from Heath Creek to Beltline Road with buffered bike lanes, a landscaped median, and a pedestrian plaza. This plan is intended to create a walkable viable, complete street that is safe, pedestrian friendly, and a destination for DeSoto and the surrounding communities.

Project Status: Design engineer was working on 30% design after completing 15% design. However, the design of the project is on hold currently.

Last Update: July 2024

City Contact: MD Hossain

 

Project Name: 2023 Renovation and Replacement Phase 1A

Project Location/Limits: Woodhaven Dr., Ray Andra Dr., Woodlawn Dr. and Lakewood Dr.

Project Type: Water and Sewer replacement

Project Description: Replace 4,170 LF of water main and 3,904 LF of sanitary sewer main. All the existing 6” pipe will be replaced with 8” PVC or HDPE pipe.

Project Status: Design is 90% completed and city staff provided review comments. Tentatively final civil plan will be received from the consultant by the end of June.

Last Update: July 2024

City Contact: Mohammed Howlader

 

Project Name: 2023 Renovation and Replacement Phase 2A

Project Location/Limits: Woodhaven Dr., Ray Andra Dr., Woodlawn Dr. and Lakewood Dr.

Project Type: Pavement replacement

Project Description: Reconstruction of streets

Project Status: Design is 70% completed. Design engineer is working on 90% design and tentatively city staff will receive the 90% design by mid-July.

Last Update: July 2024

City Contact: Mohammed Howlader

Project Name: 2023 Renovation and Replacement Phase 1B

Project Location/Limits: Vince Ln, Red Bud, and Oak Trail

Project Type: Water and Sewer replacement

Project Description: Replace 4,891 LF of water main and 3,234 LF of sanitary sewer main. All the existing 6” pipe will be replaced with 8” PVC or HDPE pipe.

Project Status: Design is 90% completed and city staff provided review comments. Tentatively final civil plan will be received from the consultant by the end of June.

Last Update: July 2024

City Contact: Mohammed Howlader

 

Project Name: 2023 Renovation and Replacement Phase 2B

Project Location/Limits: Vince Ln, Red Bud, and Oak Trail

Project Type: Pavement replacement

Project Description: Reconstruction of streets

Project Status: Design is 70% completed. Design engineer is working on 90% design and tentatively city staff will receive the 90% design by mid-July.

Last Update: July 2024

City Contact: Mohammed Howlader

Project Name: 2021 Street Reconstruction

Project Location/Limits: Wintergreen Rd. (Westmoreland Rd. to Ten Creek Mile Creek Bridge); UHL Rd., (Parkerville Rd. to S. City Limits), Parkerville Rd., (Cockrell Hill Rd. to Hampton Rd.), The Meadows Parkway.

Project Type: Street Reconstruction

Project Description: Reconstruct or rehabilitate asphalt pavement

Project Status: Construction is 100% completed. After reconstruction city staff found some cracks on the West Parkerville Rd and currently city staff is assessing the problem and finding the solution to address the issue. 

Last Update: July 2024

City Contact: MD Hossain

 

Project Name: 2023 Alley Reconstruction

Project Location/Limits: Oak Meadows Ln., Woodbrook Dr., Glen Ave., Pine Tree/Shadywood, Hillside/Crestwood Cloudcrest/Blue Sky and Stardust/Blue Sky, Westlake Alley.

Project Type: Alley

Project Description: Remove and reconstruct alley pavement

Project Status: Design is 100% complete. City staff is currently reviewing final bid documents.  

Last Update: July 2024

City Contact: Mohammed Howlader

 

Project Name: Shoreline Dr. Drainage

Project Location/Limits: Shoreline Dr. and Beltwoods Dr.

Project Type: Drainage

Project Description: Drainage Infrastructure replacement and shoring of failing support, Install Gabions and anchors.

Project Status: Construction contract was awarded to a contractor on 5/7/2024. Construction is expected to begin in late June.

Last Update: July 2024

City Contact: Mohammed Howlader

 

Project Name: Methodist Care Center Erosion Control Project

Project Location/Limits: 109 Methodist Way

Project Type: Drainage

Project Description: Streambank erosion protection.

Project Status: Construction contract was awarded by the City council to Bernal Commercial Construction. City staff is working on securing Right-Of-Entry document and construction will begin as soon as ROE is obtained. Tentatively, construction will begin on June 10th if weather permits.  

Last Update: July 2024

City Contact: Mohammed Howlader

 

Project Name: Lake Grove Erosion Mitigation

Project Location/Limits: 1312/1316 Lake Grove Lane

Project Type: Drainage

Project Description: Streambank mitigation in the backyard of residences

Project Status: Bid was opened and an agenda item to award the construction contract to the lowest bidder is scheduled for the City Council meeting on 6/18/2024.

Last Update: July 2024

City Contact: Mohammed Howlader

 

Project Name: Wolf Creek Estate Drainage Improvements

Project Location/Limits: Western side of Wolf Creek Estate subdivision and along Glen Branch Tributary (between Parkerville Road and Cockrell Hill Road)

Project Type: Drainage

Project Description: Flood mitigation

Project Status: 15% design is complete and consultant is currently working on 30% design.  After meeting with the U.S. Army Corps of Engineers (USACE) on 4/09/2024, 15% design was presented to the City Council on 4/15/2024.  A virtual public meeting for residents was held on 5/16/2024 to explain 15% design and tentative schedule.

Last Update: July 2024

City Contact: MD Hossain

 

Project Name: Heath Creek - Bee Branch Basin Sanitary Sewer Replacement

Project Location/Limits: Reedsport Pl., Stinnett Pl. and Heath Creek

Project Type: Sanitary Sewer Line Replacement

Project Description: Replacement of 1840 LF 6” sanitary sewer main with 8” pvc pipe.

Project Status: Design is 90% completed. Bid documents will be prepared after easements are finalized and funding becomes available.

Last Update: July 2024

City Contact: MD Hossain

 

Project Name: Westlake Dr. - Sewer and Pavement Replacement

Project Location/Limits: Westlake Dr.

Project Type: Sanitary sewer replacement and pavement reconstruction

Project Description: Replacing 3100 LF of sanitary sewer main with mostly 15” sanitary sewer main and existing pavement

Project Status: Design is 60% completed.

Last Update: July 2024

City Contact: MD Hossain

 

Project Name:  Westmoreland Road Pump Station Rehabilitation

Project Location/Limits: Westmoreland Road Pump Station

Project Type: Pump Station Rehabilitation

Project Description: Replacement of vertical turbine pumps, appurtenances and ground storage rehabilitation.

Project Status: Design is 90% completed

Last Update: July 2024

City Contact: Brandon Lacy 

Project Name:  Bolton Boone Pressure Zone Improvements

Project Location/Limits: Centre Park to Westmoreland Rd. / Cedar Rapids

Project Type: Pressure Zone Expansion

Project Description: Installation of 7900 linear feet of 20 inch transmission main, new pump station for the Bolton Boone Service Area and 500K gallon elevated storage tank.

Project Status: Design is 5% completed

Last Update: July 2024

City Contact: Brandon Lacy

 

Project Name: Curtistene S. McCowan Park - Recreation and Aquatic Facility

Project Location/Limits: UHL Road and Academy Way

Project Type: Facility

Project Description: Natatorium and Recreation Center

Project Status: City staff provided review comments on 100% design and currently consultant is addressing those review comments. Coordination with utility companies is in progress. Construction is projected to begin in Summer of 2024.

Last Update: July 2024

City Contact: Chris Glover

City CIP Projects Map_2024F
SUBDIVISIONS
Residential Subdivisions (Private)

Project Name: Medlock Addition

Number of Lots:  5 Residential lots
Project Location: South-east Intersection of Westmoreland Rd. and Parkerville Rd.
Project Status: Design
Developer: Ken Medlock

Project Name: Watermark Estates

Number of Lots:  38 Residential lots
Project Location: South-east corner of Parkerville Rd. and Westmoreland Rd. Intersection
Project Status: Pre-Construction
Developer: Mike Nawar

Project Name: Parkerville Meadows Phase 4

Number of Lots:  104 Residential lots
Project Location: South end of Wentwood Dr.
Project Status: Construction
Developer: Keith Davis

Project Name: Creeks of Homestead (formerly Homestead at Daniel Farm) - East Phase 2
Number of Lots:  54 Residential lots
Project Location: Westmoreland Rd. south of Danieldale Rd.
Project Status: Construction
Developer: Wildwood Development

Project Name: Grand Park Estates - 340 Parks Dr.
Number of Lots:  12 Residential lots
Project Location: West end of Sycamore Dr.
Project Status: Design
Developer: Gabriel Ekpo

Project Name: Marigold Hills Subdivision Phase 2
Number of Lots:  43 Residential lots
Project Location: 450 S. Parks Dr.
Project Status: Design
Developer: GWC Homes, LLC
 

Project Name: Christarm WinWin Addition
Number of Lots:  5 Residential Lots
Project Location: East of Hampton Rd., north side of Parkerville Rd., just west of Terrace Dr.
Project Status: Pre-Construction
Developer: Christarm Custom Homes, LLC
 
Project Name: Terrace Drive Duplexes
Number of Lots:  3 Duplex Lots
Project Location: East of Terrace Dr., north of Parkerville Rd.
Project Status: Design
Developer: Derrick Barker 

COMMERCIAL PROJECTS
Commercial Projects (Private)

Project Name: DeSoto Event Center
Project Location: 160 Sea Hawk Dr.
Project Type: Retail
Project Status: Construction

Project Name: STAYAPT Suites
Project Location: South-West corner of Centre Park Blvd. and I-35 Frontage Rd.
Project Type: Hotel
Project Status: Design
      
Project Name: Parc at Daniel Farms - Apartment Complex Phase I 
 Project Location: West side of Bolton Boone Dr. north of Danieldale Rd. 
 Project Type: Apartments
 Project Status: Design
 
Project Name: Warehouse
Project Location: 1363-1371 Marilyn Ave.
Project Type: Industrial
Project Status: Pre-Construction
 
Project Name: Lot 6A, Block A Patterson-Beckley Addition
Project Location: 1356 Sherry Ln.
Project Type: Industrial
Project Status: Design
 
Project Name: ONCOR Storage Yard
Project Location: 1220 E. Pleasant Run Rd.
Project Type: TBD
Project Status: Design

Project Name: Tater Shack
Project Location: 1018 Pleasant Run Rd.
Project Type: Restaurant
Project Status: Construction
 
Project Name: Fairfield Inn & Suites
Project Location: 1201 E. Wintergreen Rd.
Project Type: Hotel
Project Status: Construction

Project Name: Lot 3B, 3C Eagle Park East
Project Location: 917 E. Centre Park Blvd.
Project Type: Industrial
Project Status: Design

Project Name: La Quinta Inn & Suites
Project Location: N. I-35E at E. Centre Park Blvd.
Project Type: Hotel
Project Status: Construction
 
Project Name: Shops at Wintergreen - Phase 2 - Bay Valley Professional Center
Project Location: 1 W. Wintergreen Rd.
 Project Type: Retail
Project Status: Pre-Construction

Project Name: Medical Office Building
Project Location: 1100 Hwy 67
Project Type: Hospital
Project Status: Construction

Project Name: Amazon Data Collection Facility - 201 Ezell Dr.
Project Location: 201 Ezell Dr.
Project Type: Light Industrial
Project Status: Pre-Construction

Project Name: Uplift Hampton Preparatory Addition - 121 Seahawk Dr.
Project Location:  121 Seahawk Dr.
Project Type: School
Project Status: Construction

Project Name: Starbucks - 620 W. Belt Line Rd.
Project Location: 620 W. Belt Line Rd.
Project Type: Restaurant
Project Status: Construction

Project Name: Sunshine Pediatrics
Project Location: 1049 E. Belt Line Rd.
Project Type: Hospital
Project Status: Construction

Project Name: Wendy's Restuarant
Project Location: 800 S. Hampton Rd.
Project Type: Restaurant
Project Status: Construction

Project Name: Eternal Rest Funeral Home - Crematory 
Project Location: 1801 Kestrel Ave.
Project Type: TBD
Project Status: Design

Project Name: Access Storage DeSoto
Project Location: 3404 N. I-35E
Project Type: Warehouse
Project Status: Design

Project Name: Home 2 Suites Hotel
Project Location: 2716 Hwy 67
Project Type: Hotel
Project Status: Design

Project Name: Wintergreen Day HUB
Project Location: 116 E. Wintergreen Rd.
Project Type: Hospital
Project Status: Design

Project Name: Spring Hill Suites Addition 
Project Location: 1324 Wintergreen Ct.
Project Type: Hotel
Project Status: Design