Water & Sewer Tap Requirements
Water & Sewer Tap Requirements
Requirements for Water Taps
  • Applicable Permits must be acquired from the Building Inspection Department 972.230.9610, and Construction Inspection Department 972.230.9617, prior to the Water/Wastewater notification and/or performance of tap services.
  • Utility locations are to be requested by the contractor by calling DIGTESS 1.800.344.8377 for gas, electric, telephone, and cable. For water/wastewater, call 972.230.5724.
  • The water main is to be exposed by the contractor and large enough for utility crews to make a water tap. The hole should be shored properly if necessary. The hole should be barricaded off to avoid any pedestrian accident.
  • The Water/Wastewater Department should be notified seventy-two (72) hours in advance to the desired time of the tap at 972.230.5724 with lot number, block number, and physical address.
  • The contractor will supply the service line from the tap to the meter connection. The service line needs to be DR 9 or black poly (with stainless inserts for compression fittings).
  • The contractor/plumber is responsible for connecting the meter to the customer service line.
  • The contractor is responsible for back filling the hole and setting the meter box. The City will furnish the box when the meter is set. The top of the meter, when set, shall be minimum 9”/ maximum 12” below top of meter box.
  • If the contractor cannot find water tap, contractor should call utility department for water main line location. The contractor will be responsible for exposing the main.

Requirements for Sewer Taps 
  • Applicable Permits must be acquired from the Building Inspection Department 972.230.9610, and Construction Inspection Department 972.230.9617, prior to the Water/Wastewater Department notification.
  • Utility locations are to be requested by the contractor by calling DIGTESS 1.800.344.8377 for gas, electric, telephone, and cable. For water/wastewater, call 972.230.5724.
  • The sanitary sewer main is to be exposed by a contractor and large enough for utility crews to make a sewer tap. The hole should be shored properly if necessary. The hole should be barricaded off to avoid any pedestrian accident.
  • The Water/Wastewater Department should be notified seventy-two (72) hours in advance to the desired time of the tap at 972.230.5724 with lot number, block number, and physical address. The notification should include size of sewer/water tap.
  • The contractor will supply the service line from the tap to the service connection. The service line is to be SDR 26 PVC. The contractor/plumber is responsible for the connection to the customer's service line.
  • The contractor is responsible for back filling the hole and installing a property line clean out (P.L.C.O.) with a one-way steep, toward the sanitary sewer main.
  • If the contractor cannot find the sewer tap, contractor should call the Water/Wastewater Department for sewer main line location. The contractor will be responsible for exposing the main.